Exam PK0-005 All QuestionsBrowse all questions from this exam
Question 18

The project team determines that software installation can only begin after the desktops have been installed and can be powered on. Which of the following dependencies does this represent?

    Correct Answer: C

    The described scenario indicates that the software installation can only commence once the desktops are installed and powered on, making this an unavoidable dependency due to the natural sequence of tasks. This type of dependency is considered mandatory because it represents a constraint that cannot be bypassed under any circumstances. Mandatory dependencies arise from the fundamental requirements necessary for the tasks to be executed in a particular order.

Discussion
BlueMan93Option: C

Mandatory dependency - is unavoidable. Can often arise because of natural order (example: a user cannot create a password until they first access the site) - pg. 250 - "The Official CompTIA Project+ Guide (PK0-005)"

lamborghiniOption: C

Internal dependencies are dependencies that occur within the project team or organization. For example, a task can only begin after a team member has completed a training course. Mandatory dependencies are dependencies that are required for the project to be completed. For example, a task can only begin after a new piece of equipment has been delivered. These are very similar in this scenario. A dependency can be both internal and mandatory

NarobiOption: B

I would agree with B based on the definitions and wording of the question. With internal dependencies, that points to how one task depends on another being completed within the project scope. Mandatory is an absolute no other way hard requirement in the order of tasks. It is true that the software has to come after the system installations and powered on, but it does not absolutely have to be the next step. They could do install > powered on > install peripherals > install software for example. This example would fit internal and not mandatory, and the question does not state that is HAS to be done after the installation, only that it can only begin after that step.

Narobi

To clarify a point, a task can be internal(external) AND mandatory(discretionary), but based on wording I would say it is only internal.

7acdde5Option: C

Agree with C

eXhilarat3dOption: B

Per AI source... B. Internal. Internal dependencies are those that are within the control of the project team, such as the sequence of tasks. In this case, the installation of desktops before software installation is an internal sequence that the project team manages.

hardware69Option: C

It is internal: Hard logic dependencies are also known as mandatory dependencies. These dependencies are usually legally or contractually required. They can also be directed by company procedures or physical limitations. Internal dependencies are dependencies between tasks or activities within the project. They involve a precedence relationship between project activities.

TheFaiOption: C

Mandatory. It can't be circumvented. The software can only be installed when the system is powered on.

CaoilfhionOption: B

It is B, as we need to break the question and given answer sets down. If internal was not offered in the list, then Mandatory would be the answer. But, since both classification types of Internal and External were offered, the question is looking for a more specific answer. As Mandatory can be applied to either Internal or External, it's not the best/specific answer, hence the "trip up" here. Mandatory is not wrong, but its not the most detailed way to describe this scenario. We aim for the most detailed classification, so we can find a solution more quickly, regardless if the problem is holding the project up or not. Mandatory would only convey the severity on how soon we need to address it.