Refer to the exhibit.
Server 1 fails to connect to the storage array over the Storage Area Network (SAN) of the Cisco MDS 9000 Series Switch. The requirements are to redesign the storage network and keep these considerations in mind:
• The traffic from each of the servers must be redundant and isolated.
• The design must tolerate hardware and software failures and upgrades of SAN fabric devices.
Which action must be taken to meet these requirements?