A Cisco UCS C-Series Server powers off due to a power outage. The server should turn on when the power is restored with a fixed delay of 3 minutes. However, it remained powered off for more than 3 minutes after the engineer powered it back online. Which two actions resolve the issue? (Choose two.)

Show Answer
Correct Answer: AE

To resolve the issue of the server not turning back on within the specified delay after a power outage, two actions are necessary. First, configuring the power-restore-policy ensures the system knows the behavior it should follow when power is restored. This policy determines whether the server should remain off, turn on immediately, or turn on after a specified delay. Second, setting the delay value to 180 seconds ensures the server waits the correct amount of time (3 minutes) before powering back on. Ensuring both these configurations are in place will address the issue described.

Discussion

2 comments
Sign in to comment
paradigm88
Jun 29, 2024

https://www.cisco.com/c/en/us/td/docs/unified_computing/ucs/c/sw/cli/config/guide/131/b_Cisco_UCS_C-Series_CLI_Configuration_Guide_131/Cisco_UCS_C-Series_CLI_Configuration_Guide_131_chapter2.html#:~:text=The%20power%20restore%20policy%20determines,after%20a%20chassis%20power%20loss.&text=You%20must%20log%20in%20with%20admin%20privileges%20to%20perform%20this%20task.&text=Enters%20the%20chassis%20command%20mode.&text=Specifies%20the%20action%20to%20be%20taken%20when%20chassis%20power%20is%20restored.

paradigm88
Jun 29, 2024

though i m not sure about last state, since in the question is saying just "on"

scorpfeOptions: AE
Apr 8, 2025

A and E