Exam 156-31581 All QuestionsBrowse all questions from this exam
Question 245

John detected high load on sync interface. Which is most recommended solution?

    Correct Answer: C

    The most recommended solution to handle increased load on the sync interface is to add a second interface to handle sync traffic. This approach distributes the load, ensuring that synchronization does not become a bottleneck and performance is maintained. Unlike delaying synchronization or not synchronizing certain types of connections, adding a second interface directly addresses the problem of high load without compromising the integrity and reliability of synchronization.

Discussion
nmrouterOption: D

Correct answer is D. CCSE documentation page 530.

KeerberusOption: D

CCSE Page 530 "ClusterXL by default synchronizes most TCP. UDP and other services excluding a few such as IGMP protocols. Broadcast and all multicast traffic information is not synchronized. The administrator may choose not to synchronize specific services for various reasons such as: • To improve the performance of the cluster • The service uses short connections. e.g. ONS and HTTP Two service objects. one without and other with synchronization"

ShahrouzOption: D

Answer is D

Shahrouz

Apologize. I have investigated little more and it seems to be A https://sc1.checkpoint.com/documents/R81/WebAdminGuides/EN/CP_R81_Maestro_AdminGuide/Topics-Maestro-AG/Configuring-services-to-synchronize-after-delay.htm