A project uses two issue types named Task and Sub-task which share the workflow shown below.
What is the maximum number of screens that can be used in the current project configuration?
A project uses two issue types named Task and Sub-task which share the workflow shown below.
What is the maximum number of screens that can be used in the current project configuration?
The maximum number of screens that can be used in the current project configuration is 6. This is because each transition in the workflow can have a screen configured. Given that the workflow has 3 transitions (Create, Start Progress, Done) and there are two issue types (Task and Sub-task), the calculation is 3 transitions multiplied by 2 issue types, which equals 6 screens.
The answer is 8 -- 3 screens per issue type and 1 per transition
E as you can only configure a screen in workflow per transition so 2 task types with 3 transitions would be 6.