According to the Physical Protection System project rules of thumb, which of the following will comprise the largest percentage of a system's cost?

Show Answer
Correct Answer: AB

When considering the cost of a Physical Protection System project, design and engineering typically make up the largest percentage of the system's cost. This encompasses the detailed planning, system integration, and customization required to meet specific security needs. While hardware and software are significant, their cost is usually dwarfed by the expenses associated with the expertise and labor required for designing and engineering a comprehensive security system.

Discussion

1 comment
Sign in to comment
lin12345678Option: C
Jul 17, 2023

please check out official guide