Question 6 of 79
What are three available associations in the Hazards application? (Choose three.)
    Correct Answer: C, D, E

    The three available associations in the Hazards application are Hazardous Materials, Tag Outs, and Precautions. These elements are crucial for managing and mitigating risks associated with hazardous conditions and ensuring safety protocols are followed.

Question 7 of 79
In the Assets application a used engine needs to be replaced with a rebuilt engine, how might the rebuilt engine inherit the depreciation schedule from the used engine?
    Correct Answer: C

    To ensure the rebuilt engine inherits the depreciation schedule from the used engine, the correct action to use is 'Swap Depreciation Schedules'. This action allows for the swapping of depreciation schedules between assets, thus seamlessly transferring the schedule from the old engine to the rebuilt one.

Question 8 of 79
The IoT Connector provides Maximo Manage, Maximo Health and Maximo Predict the ability to connect to which two data sources? (Choose two.)
    Correct Answer: C, E

    The IoT Connector provides Maximo Manage, Maximo Health, and Maximo Predict the ability to connect to IBM Watson IoT Platform and Maximo Monitor. IBM Watson IoT Platform is used for collecting, visualizing, and analyzing data, while Maximo Monitor provides real-time monitoring of assets and operations. These connections are essential for leveraging IoT capabilities within the Maximo suite.

Question 9 of 79
What combination of information on a Work Order is used to create a histogram in the Graphical Scheduling application?
    Correct Answer: C

    The correct combination of information used to create a histogram in the Graphical Scheduling application is Craft Quantity and Hours. This combination specifically relates to the allocation and tracking of resources (crafts) and the amount of time (hours) required or scheduled for tasks on a Work Order.

Question 10 of 79
What is a core application in Maximo Manage?
    Correct Answer: D