Question 6 of 53A customer needs to collect a support dump from its appliance, but when the customer attempts to save the support dump to a USB drive, no valid USB drive displays as available in the HPE Synergy Management Console. Which action should the Synergy integrator propose to the customer?
Correct Answer: B
Question 7 of 53A Synergy integrator has planned a highly available Synergy composable fabric with 20Gb Interconnect Link Modules. What is the maximum number of SY 480 Gen9 compute modules the integrator can install into this configuration?
Correct Answer: B
Question 8 of 53Refer to the exhibit. Based on the Synergy configuration shown, what will be the outcome in the event of an end-of-row (EoR) switch failure?
Correct Answer: B
Question 9 of 53Refer to the exhibits. A customer has a Synergy 2-frame design, as shown above. Due to expanding business needs, the customer has ordered a third frame to expand the environment to a 3-frame fabric design, as shown below. While attempting to extend the Logical Interconnect Group (LIG) for the enclosure group, the Synergy integrator is unable to add the third frame. What is preventing the integrator from adding the third frame?
Correct Answer: C
Question 10 of 53DRAG DROP - Use the arrow or click and drag the steps on the left to set up a new HPE Synergy 12000 Frame into the correct order on the right. Select and Place: