Question 6 of 60 Refer to the Exhibit. A network engineer receives the output shown when removing MLAG from a pair of N-Series switches. Which sequence of steps must the engineer complete to remove the vpc peer-link from Port Channel 1?
Correct Answer: D
Question 7 of 60A network engineer has connected a Port Extender to a C-Series switch. While issuing the command "show pe brief" on the C-Series switch, the engineer sees a status of "offline". Which two things could be causing the Port-Extender to show "offline"? (Choose two.)
Correct Answer: A, B
Question 8 of 60 Refer to the exhibits. A customer upgrades its C-Series switch and is experiencing a constant boot loop. Which two options allow the switch to boot successfully using the newer firmware? (Choose two.) A. B. C. D. E.
Correct Answer:
Question 9 of 60A network engineer needs to summarize the IP range of addresses from 172.16.32.0 to 172.16.35.255. What is the most effective choice?
Correct Answer: C
Question 10 of 60When facing the front of a C-Series switch, in which direction does air flow?