Question 6 of 158

Which two of the following apply during a project’s close out process? (Choose two.)
Answer

Suggested Answer

The suggested answer is A, E.

Community Votes

No votes yet

Join the discussion to cast yours

Question 7 of 158

Telecommunications cabling (e.g., voice, data, video, security, audio, control) can be damaged during the construction phases of rough-in, drywall installation, and during the siding of the exterior. For these reasons, telecommunications cabling shall be acceptance tested. Acceptance testing includes visual examination and verification of all cabling and qualification of copper cabling for data cabling or certification of copper or optical fiber cabling for data cabling. Verification testing is generally performed in which two of the following steps? (Choose two.)
Answer

Suggested Answer

The suggested answer is B, D.

Community Votes

No votes yet

Join the discussion to cast yours

Question 8 of 158

To properly size and provide accurate cost estimates for a communications distribution horizontal pathway that will include BAS system infrastructure, the designer should provide ________ for every BAS outlet or device based on total floor area.
Answer

Suggested Answer

The suggested answer is B.

Community Votes

No votes yet

Join the discussion to cast yours

Question 9 of 158

Which of the following is the process of limiting fire and smoke using fire-resistive barriers?
Answer

Suggested Answer

The suggested answer is C.

Community Votes

No votes yet

Join the discussion to cast yours

Question 10 of 158

An ICT distribution designer is providing labeling for a data center room number 2A, located on the second floor having 10 rows of cabinets. Which of the following identifiers/labels would the designer attach to the bonding and grounding conductor between the first cabinet in the 6th row and the data center ground bar?
Answer

Suggested Answer

The suggested answer is B.

Community Votes

No votes yet

Join the discussion to cast yours