Microsoft Power Automate RPA Developer

Here you have the best Microsoft PL-500 practice exam questions

  • You have 158 total questions to study from
  • Each page has 5 questions, making a total of 32 pages
  • You can navigate through the pages using the buttons at the bottom
  • This questions were last updated on November 19, 2024
Question 1 of 158

Case study -

This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.

To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other questions in this case study.

At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section of the exam. After you begin a new section, you cannot return to this section.

To start the case study:

To display the first question in this case study, click the Next button. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. When you are ready to answer a question, click the Question button to return to the question.

Background:

City Power and Light is one of the biggest energy companies in North America. They extract, produce and transport oil. The company has more than 50 offices and 100 oil extraction facilities throughout the United States, Canada, and Mexico. They use railways, trucks, and pipelines to move oil and gas from their facilities.

The company provides the following services:

* Produce oil from oil sands safely, responsibly, and reliably.

* Refine crude of into high-quality products.

* Develop and manage wind power facilities.

* Transport oil to different countries/regions.

City Power and Light uses various Microsoft software products to manage is daily actives and run its machine-critical applications.

Maintenance Tasks:

A user named Admin1 creates a cloud flow named ManagePipelineMaintenanceTasks. Admin1 applies a data loss prevention (DLP) policy to the flow. Admin1 shares the flow with a user named PipelineManager1 as co-owner. You must determine the actions that PipelineManager1 can perform.

Maintenance Scheduler:

You create a cloud flow that uses a desktop flow. The desktop flow connects to third-party services to fetch information. You must not permit the desktop flow to run for more than 20 minutes.

You must configure sharing for MaintenanceScheduler to meet the following requirements:

* User1 must be able to work with you to modify the desktop flow.

* User2 must be able to access and review the run history for the flow.

* You must grant User3 permissions to run but not modify the desktop flow.

ERPDataOperations flow:

City Power and light uses an enterprise resource planning (ERP) system. The ERP system does not have an API.

Each day the company receives an email that contains an attachment. The attachment lists orders from the company’s rail transportation partners. You must create an automation solution that reads the contents of the email and writes records to the ERP system. The solution must pass credential from a cloud flow to a desktop flow.

RailStatusUpdater:

City Power and Light actively monitors all products in transit. You must create a flow named RailStatusUpdater that manages communications with railways that transport the company’s products. RailStatusUpdater includes five desktop flow actions.

You must run the desktop flows in attended mode during testing. You must run the desktop flows in unattended mode after you deploy the solution. You must minimize administrative efforts.

Packaging:

You must package the automations in a solution. All required components must be included in the solution.

ProductionMonitor flow:

You create a cloud flow named ProductionMonitor which uses the Manually trigger a flow trigger. You plan to trigger ProductionMonitor from a cloud flow named ProdManager.

You add a Run a Child flow action in ProdManager to trigger ProductionMonitor. When you attempt to save ProdManager the following error message displays:

Request to XRM API failed with error: 'Message:Flow client error returned with status code "Bad request" and details "("error":

{"code":ChildFlowUnsupportedForinvokerConnections", "message": The workflow with id 8d3bcde7-7e98-eb11-b1ac-000d3a32d53f", named FlowA cannot be used as a child workflow because child workflows only support embedded connections. "}}"Code" 0x80060467 InnerError.'

CapacityPlanning flow:

Developers within the company use could flows to access data from an on-premises capacity planning system.

You observe significant increases to the volume of traffic that the on-premises data gateway processes each day. You must minimize gateway failures.

DataCollector flow:

You have a desktop flow that interacts with a web form. The flow must write data to several fields on the form.

You are testing the flow. The flow fails when attempting to write data to any field on the web form.

RailStatusUpdater flow:

The RailStatusUpdater flow occasionally fails due to machine connection errors. You can usually get the desktop flow to complete by resubmitting the cloud flow run. You must automate the retry process to ensure that you do not need to manually resubmit the cloud flow when machine connection errors occur.

You need to resolve the issue with the DataCollector flow.

What are two possible ways to achieve the goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

    Correct Answer: B, E

    To resolve the issue with the DataCollector flow which fails when attempting to write data to any field on the web form, you have two viable options. First, replacing the Populate text field on a web page action with the Send keys action can sometimes help as it navigates into text fields using keyboard keys, providing a more reliable way of entering data in cases where direct text population fails. Second, modifying selectors to ensure that field attributes are mapped correctly is crucial. Web forms can have dynamic selectors that change, leading to issues when the automation cannot locate the correct fields. By modifying these selectors, you ensure that the automation accurately identifies each field, thereby preventing the errors.

Question 2 of 158

You need to package the automations.

What should you do?

    Correct Answer: D

    The correct approach to package automations involves ensuring all necessary components are included within the solution to maintain the integrity and functionality of the automation. Adding required components to each item within the solution ensures that all dependencies and essential elements are automatically included, thereby preventing any issues related to missing components. This method guarantees a comprehensive and complete solution package.

Question 3 of 158

HOTSPOT -

You need to configure the solution for the ERPDataOperations flow.

Which configuration values should you use? To answer, select the appropriate options in the answer area

NOTE: Each correct selection is worth one point.

    Correct Answer:

Question 4 of 158

You need to identify the actions that PipelineManager1 can perform.

Which three actions can PipelineManager1 perform? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

    Correct Answer: B, C, F

    PipelineManager1 can modify or delete a flow, add or remove other owners, and view the run history. They cannot set the cloud flow priority, override the data loss prevention (DLP) policy, or modify another owner's connection credentials. Co-owners are specifically allowed to manage the properties of a flow, which includes viewing the run history, and can also edit the flow itself and manage ownership, but cannot override DLP policies or change another co-owner's credentials.

Question 5 of 158

You need to configure the desktop action for the MaintenanceScheduler cloud flow.

Which two actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

    Correct Answer: B, D

    To configure the desktop action for the MaintenanceScheduler cloud flow, you should first navigate to the Desktop flow action settings in the cloud flow. This allows you to access the necessary options and settings for the desktop action. Once there, you need to set the Timeout property and update the duration to PT20M, as the 'PT' format is correct for indicating a time duration in ISO 8601 standard. This ensures that the desktop action is correctly configured within the cloud flow with the appropriate timeout setting.